1. The steel grating should be connected with the drawings before the equipment inspection of the steel grating, and those that are unqualified shall not be put into the project.
2. Before the steel grating equipment, certain equipment should be arranged in sequence, and the equipment should be arranged in sequence according to the drawing number.
3. When installing steel grating, the flat steel standard policy and the load-bearing standard policy should be adopted, and the equipment process should be extended from the steel ladder plan on the first floor to the adjacent area.
4. At least 2 sets of equipment fixtures should be equipped on each steel grating. After welding and fixing are completed, the welding contact points should be painted to avoid rusting.
5. The steel grating equipment must be fixed one by one to prevent people from standing on the unfixed steel grating when working at heights.
6. When working at a high place above the steel grating, the equipment personnel should fasten their seat belts and take protective measures for the steel grating.
7. Prevent employees of steel grating aerial work equipment from having small objects and accessories (wrenches, welding rods, etc.) in their pockets to avoid falling and hurting people.
https://www.topsteelgrating.com/











